Project profile.

Client: Burnie Waterfront Redevelopment
Value: $2M
Timeline: 2010
Brief:

Stubbs constructions engaged Rare to undertake a re-design of a waterfront development to achieve a 30% cost saving back to the client. Rare provided an innovative precast concrete design opposed to insitu as originally specified.

challenges:

Working in a public space dealing with tidal movements and shifting sand levels made the design of this project a challenge.

the rare innovation:

We developed a precast solution and then worked closely with Contractor Stubbs Constructions to ensure that the ever-changing environmental conditions did not impact on the service life of the project.

key benefits:

Detailed construction and constructability knowledge with close collaboration with the builder and client enabled this project to be delivered successfully for all parties involved with a significant reduction in project cost over the original design.