Central Coast Grammar

$10M

A new Performing Arts Centre for Central Coast Grammar was constructed by Stevens Construction’s in 2013 with architectural design by CBM Sustainability Group.

The facility included classrooms, cafes, creative spaces and a 750 seat theatre.

The facility required all aspects of structural engineering design including screw piling, bored concrete piers, soldier pile walls, reinforced concrete footings and slabs, suspended concrete floors, reinforced masonry and precast concrete walls, composite structural steel and timber framing.