The Silverdome Main Concourse Upgrade Project was undertaken with Philp Lighton Architects.  A major upgrade of the concourse was required internally and externally to bring life back into the building that was originally constructed in 1985.

The design included a combination of steel and timber framing to provide a cost-effective solution. The challenges of this project were to provide a bracing solution to the large wind sail at the front entry. This was achieved with a series of steel bracing frames hidden in the building walls.