Project profile.

Client: Fulton Hogan
Value: < $0.5M
Timeline: 2022
Brief:

This project required steel sheet piling design verification – steel sheet piles were driven 6m deep for a retention and excavation project on the river bank. The project was subject to variable water levels, including flooding.

challenges & successes:

One of the challenges faced was creating a three-sided cofferdam with variable levels in the riverbank which lead to an imbalance. Despite this, the design verification resulted in positive outcomes in respect to the resilience, safety and construction of the sheet pile.

the rare innovation:

Using technology to solve problems that could impact the project.

key benefits:

Ensuring the work was completed safely for the client, taking into consideration many factors.