Project

Lapoinya Road Bridge

$1.2M

Bridge over Flowerdale River

40m long, two span, two lane bridge replacement of the flood damaged existing bridge.

Client: Waratah Wynyard Council

Contractor: VEC Civil Engineering

Engineering Edge designed the replacement Lapoinya Road bridge when the original timber bridge was washed away in the June 2016 floods.  The two lane, two span bridge, was constructed using precast super t-beams, precast pier blocks and integral concrete abutments.